Unik Filtersystem AS established great collaboration from the very start of the project and was available 24/7. In cooperation with Unik, the Borgundvåg VBA project, which was under time pressure from the start, was carried out in record time, so that connected subscriptions received clean and good drinking water. Unik delivers a good product and a great service network, so that the operational reliability of the plant is ensured.

The delivery from Unik Filtersystem contained all machines and process equipment inside the building. The plant was delivered on a frame: Particle filter, LIT UV, double production lines, pressure boosting system, clean water tank, process control and emergency power.

Sincerely

Kristoffer Nes Berg

Contractor service

SEARCH